ENERGY SERVICE'S INTL. LLC.

THESE ARE TWO DIFFERENT PROJECTS

THEY HAD US DO SOME FABRICATING ON THIS SKID. ALL THE PLUMBING HAD TO BE REDONE OVER FOR A DIFFERENT JOB, SUCH AS THE MOTOR CAME OFF, ALL THE PIPE'S REMOVED, THE UPPER PART OF THE TANK HAD TO HAVE A SECTION CUT OUT FOR A NEW LID TO BE FABRICATED IN, A PIECE OF PIPE ON TOP IN FRONT OF THE TANK HAD TO BE REMOVED TO PUT A LARGER PIPE ON, AND ONE PIPE ON THE BOTTOM OF THE TANK HAD TO BE REMOVED TO PUT A LARGER PIPE ON. WE PUT NEW FLOORING ON THE SKID ITSELF TO WALK AROUND ON, STEPS WHERE FABRICATED FOR IT. AND THROUGH THE REST OF THE PICTURES YOU CAN SEE THE FABRICATION OF THE PIPE BEING INSTALLED.

AS YOU CAN SEE HERE THE 90 AND FLANGE HAD TO BE REPLACED FOR A BIGGER 90 AND FLANGE. ONCE THE 90 WAS REMOVED WE HAD ENLARGE THE HOLE FOR THE LARGER PIECE TO FIT. ONCE INSTALLED IT WAS BLASTED AND REPAINTED.

 